Radiant heat, Plumbing Pipes & Concrete Pouring
Next, the area is prepared for the slab. The plumbing pipes are “stumped up” (installed) in their precise locations. The plastic tubing for radiant heat is also put into place, and the concrete is then “boom pumped” into the area.